# NYC – 92 STELCOR® DDM in Difficult Soils in The Bronx

 March 30th, 2016

 1 min read

 By [Bruce Stroyer](https://www.idealfoundationsystems.com/blog/author/bruce-stroyer)

![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/Walton.jpg?width=800&height=560&name=Walton.jpg)

ONLY THREE TENTHS OF AN INCH NET SETTLEMENT AFTER 24 HOUR LOAD TEST AT FULL LOAD OF 200 TONS!

![Walton Ave STELCOR Micropiles 1](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/Walton-Ave-STELCOR-Micropiles-1-1024x468.jpg?width=1000&height=457&name=Walton-Ave-STELCOR-Micropiles-1-1024x468.jpg)

**OVERVIEW:**

A 10-story residential 92-unit building is going up at 2065 Walton Avenue. 60 percent of the apartments will go to homeless veterans, with the remainder going to homeless youth between the ages of 18 and 25.

**CHALLENGE:**

The site challenges included a high water table and rubble foundations of the neighboring buildings which were not underpinned. Boulders were encountered up to 15’. The project was originally spec’d with Drilled Shaft Case Piles which could be installed at a rate of 1.5 piles per day and were much more expensive. Furthermore, the cost of spoil removal was cost prohibitive and oil was present in the contaminated groundwater.

**SOLUTION:**

Rich Anastasio teamed up with IDEAL to present STELCOR Drilled-In Displacement Piles as an alternate on this challenging site. In order to bypass the boulders and rubble in the soils, each pile location was rock drilled with an 18” diameter down-the-hole hammer and then pre-augered to 18’. A 70k drive head was used to install the piles to a depth of 40’. Two full 200-ton load tests were performed using 6 reaction piles each. The full 200-ton load was applied to the 40’ test piles and after the 12 hour hold period, total settlement was approximately six tenths of an inch. Upon initial unload and rebound total settlement was around three tenths of an inch. The first and second load tests showed a net settlement of 0.312” and 0.268” respectively. The production piles were installed at a rate of 8-9 piles per day and 5 on the slowest day. This resulted in a significant cost and time savings with no spoils.

[VIEW/DOWNLOAD SOILS REPORT AND LOAD TEST REPORT](https://www.idealfoundationsystems.com/wp-content/uploads/2021/01/WALTON-Ave-Load-Test-Results-and-Soil-Borings-.pdf)

[**DOWNLOAD PRINT VERSION OF CASE STUDY **](https://www.idealfoundationsystems.com/hubfs/CASE%20STUDY/WALTON%20AVE%20CASE%20STUDY.pdf)

[See how Stelcor Drilled-In Displacement Piles can save your project.](https://www.idealfoundationsystems.com/stelcor-products/)

[![Walton Ave STELCOR Micropiles 3](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/Walton-Ave-STELCOR-Micropiles-3.jpg?width=350&height=494&name=Walton-Ave-STELCOR-Micropiles-3.jpg)](https://www.idealfoundationsystems.com/hubfs/Imported_Blog_Media/Walton-Ave-STELCOR-Micropiles-3.jpg)[![Walton Ave STELCOR Micropiles 2](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/Walton-Ave-STELCOR-Micropiles-2.jpg?width=350&height=399&name=Walton-Ave-STELCOR-Micropiles-2.jpg)](https://www.idealfoundationsystems.com/hubfs/Imported_Blog_Media/Walton-Ave-STELCOR-Micropiles-2.jpg)

**GENERAL CONTRACTOR:**  
GKC Industries  
Port Washington, NY

**ARCHITECT:**  
MHG Architects  
New York, NY

**INSTALLER:**  
Rich Anastasio

**STRUCTURAL ENGINEER:**  
De Nardis Engineering  
White Plains, NY

**GEOTECHNICAL ENGINEER:**  
Haley & Aldrich Engineering  
Rochester, NY

**LOADS:**  
400 kips ultimate compression  
150 kips ultimate tension  
8 kips lateral

**SPECIFICATIONS:**  
5.5” pile shaft  
.476 wall thickness 80 ksi  
16” tip or drive plate  
12” corrugated grout column  
9” solid grout column  
8” reverse auger

**SOILS + EMBEDMENT DEPTH:**  
Fill, Alluvium, Glacial Deposits, and  
Decomposed Rock.  
40’ Embedment Depth

![Walton](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/Walton.jpg?width=800&height=560&name=Walton.jpg)

 Topics:

[ Case Study ](https://www.idealfoundationsystems.com/blog/topic/case-study)

[ Drilled-In Displacement Piles (DDM) ](https://www.idealfoundationsystems.com/blog/topic/drilled-in-displacement-piles-ddm)

[ STELCOR ](https://www.idealfoundationsystems.com/blog/topic/stelcor)

 Don't forget to share this post:

<https://www.facebook.com/sharer/sharer.php?u=https://www.idealfoundationsystems.com/blog/nyc-92-stelcor-micropiles-in-difficult-soils-in-the-bronx> <https://www.linkedin.com/shareArticle?url=https://www.idealfoundationsystems.com/blog/nyc-92-stelcor-micropiles-in-difficult-soils-in-the-bronx&title=92+STELCOR%C2%AE+Piles+Support+Building+In+Poor+Soil+in+The+Bronx&summary=Our+Stelcor+Drilled-In+Displacement+Micropiles+are+ideal+for+supporting+buildings+in+poor+soil+conditions.+Check+out+our+case+study+in+the+Bronx.> <https://twitter.com/intent/tweet?text=92+STELCOR%C2%AE+Piles+Support+Building+In+Poor+Soil+in+The+Bronx&url=https://www.idealfoundationsystems.com/blog/nyc-92-stelcor-micropiles-in-difficult-soils-in-the-bronx> <https://pinterest.com/pin/create/button/?url=https://www.idealfoundationsystems.com/blog/nyc-92-stelcor-micropiles-in-difficult-soils-in-the-bronx&media=https://47216011.fs1.hubspotusercontent-na1.net/hubfs/47216011/Imported_Blog_Media/Walton.jpg&description=Our+Stelcor+Drilled-In+Displacement+Micropiles+are+ideal+for+supporting+buildings+in+poor+soil+conditions.+Check+out+our+case+study+in+the+Bronx.>

## Related Articles

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Baltic%20St_.png?width=713&height=401&name=Baltic%20St_.png)

### STELCOR Supports a Complex Development Site in Brooklyn’s Gowanus Neighborhood

 May 18th, 2026|1 min read 

](https://www.idealfoundationsystems.com/blog/stelcor-supports-a-complex-development-site-in-brooklyns-gowanus-neighborhood)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/16-777x246.jpg?width=777&height=246&name=16-777x246.jpg)

### STELCOR Piles Installed Adjacent to Elevated MTA for Lorimer House Project

 May 18th, 2026|1 min read 

](https://www.idealfoundationsystems.com/blog/stelcor-piles-installed-adjacent-to-elevated-mta-for-lorimer-house-project)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/image-webp.webp?width=1350&height=900&name=image-webp.webp)

### NYC - 272 STELCOR Piles Installed for a 14-Story Development in Gowanus

 August 1st, 2025|1 min read 

](https://www.idealfoundationsystems.com/blog/nyc-272-stelcor-piles-installed-for-a-14-story-development-in-gowanus)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/86%20DELANCEY%20web(16)--jpg.jpeg?width=720&height=471&name=86%20DELANCEY%20web(16)--jpg.jpeg)

### NYC - 112 STELCOR® Piles to 30' for a 12-Story Mixed-Use Rental Building

 June 23rd, 2025|1 min read 

](https://www.idealfoundationsystems.com/blog/nyc-112-stelcor-piles-to-30-for-a-12-story-mixed-use-rental-building)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/INSTALL-SNIP-2-WEB.jpg?width=720&height=404&name=INSTALL-SNIP-2-WEB.jpg)

### 5.5″ HELICAL PILES FOR A HOSPITAL PARKING GARAGE RETROFIT

 December 28th, 2022|1 min read 

](https://www.idealfoundationsystems.com/blog/5-5-helical-piles-for-a-parking-garage-retrofit)

[![STELCOR® DDMS TOUCHING DOWN AT JFK AIRPORT](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/20220617_140517-WEB-scaled.jpg?width=2560&height=1920&name=20220617_140517-WEB-scaled.jpg)

### STELCOR® DDMS TOUCHING DOWN AT JFK AIRPORT

 October 31st, 2022|1 min read 

](https://www.idealfoundationsystems.com/blog/stelcor-at-jfk)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/install-gap-2.jpg?width=2400&height=1354&name=install-gap-2.jpg)

### 42 STELCOR® DDMS FOR WIND TURBINES IN CALIFORNIA

 July 25th, 2022|1 min read 

](https://www.idealfoundationsystems.com/blog/42-stelcor-ddms-for-wind-turbines-in-california)

[![FLYING EXCAVATORS AND STELCOR DDM’S AT A PAPER MILL IN DULUTH, MN](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/duluth-3-web-1.jpg?width=900&height=505&name=duluth-3-web-1.jpg)

### FLYING EXCAVATORS AND STELCOR DDM’S AT A PAPER MILL IN DULUTH, MN

 June 29th, 2022|1 min read 

](https://www.idealfoundationsystems.com/blog/flying-excavators-and-stelcor-ddms-at-a-paper-mill-in-duluth-mn)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/20210611_100954-WEB.jpg?width=2048&height=1536&name=20210611_100954-WEB.jpg)

### 93 STELCOR DDM’S INSTALLED FOR A 7-STORY HOSPITAL ADDITION

 March 3rd, 2022|1 min read 

](https://www.idealfoundationsystems.com/blog/93-stelcor-ddms-installed-for-a-7-story-hospital-addition)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/DSC00162-1.jpg?width=872&height=583&name=DSC00162-1.jpg)

### NYC – 75 STELCOR Piles for 8-Story Cantilevered Condos

 July 30th, 2021|1 min read 

](https://www.idealfoundationsystems.com/blog/nyc-75-stelcor-piles-8-story-cantilevered-condos)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/DC-SEWER-2-150x150-1-1.jpg?width=150&height=150&name=DC-SEWER-2-150x150-1-1.jpg)

### Keeping it Clean in Washington D.C. With STELCOR

 February 11th, 2021|1 min read 

](https://www.idealfoundationsystems.com/blog/keeping-clean-washington-d-c-stelcor)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/PATH-WEB-1.jpg?width=436&height=325&name=PATH-WEB-1.jpg)

### On the beaten PATH: More IDEAL Helical Piles In The NY/NJ Subway Stations

 October 8th, 2020|1 min read 

](https://www.idealfoundationsystems.com/blog/on-the-beaten-path-more-ideal-helical-piles-in-the-ny-nj-subway-stations)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/FNC-rendering-web-150x150-1.png?width=150&height=150&name=FNC-rendering-web-150x150-1.png)

### STELCOR For The First National Center

 August 10th, 2020|1 min read 

](https://www.idealfoundationsystems.com/blog/stelcor-for-the-first-national-center)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/CHSB-26.jpg?width=900&height=506&name=CHSB-26.jpg)

### Helical Pile Foundations for COVID-19 Field Hospitals in New York

 May 1st, 2020|1 min read 

](https://www.idealfoundationsystems.com/blog/helical-pile-foundations-for-covid-19-field-hospitals-in-new-york)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/302-east-2nd-street-exterior-rendering.jpg?width=736&height=401&name=302-east-2nd-street-exterior-rendering.jpg)

### NYC – East Village Homes See STELCOR Savings

 January 21st, 2020|1 min read 

](https://www.idealfoundationsystems.com/blog/east-village-homes)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/IMG_1908-resize.jpg?width=640&height=480&name=IMG_1908-resize.jpg)

### IDEAL Helical Piles at the naval academy

 September 17th, 2019|1 min read 

](https://www.idealfoundationsystems.com/blog/ideal-helical-piles-at-naval-academy)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/lincoln-terminal-helical-piles-night.jpg?width=576&height=324&name=lincoln-terminal-helical-piles-night.jpg)

### 1,321 Helical Pipe Piles for Lincoln Terminal in Natchez

 September 13th, 2019|1 min read 

](https://www.idealfoundationsystems.com/blog/1321-helical-pipe-piles-for-lincoln-terminal-in-natchez)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/NYHC-awards_DraperHall_image4-910x1024-910x1024-1.jpg?width=910&height=1024&name=NYHC-awards_DraperHall_image4-910x1024-910x1024-1.jpg)

### 295 STELCOR® DDM for the new 16-Story Gilbert in NYC

 March 9th, 2019|1 min read 

](https://www.idealfoundationsystems.com/blog/its-gonna-be-a-gilbert)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/Blackspring-Ridge-Wind-Project-Vickars-Image-7.jpg?width=640&height=360&name=Blackspring-Ridge-Wind-Project-Vickars-Image-7.jpg)

### 13.375″ Helical Pipe Piles For Western Canadas Largest Wind Project

 December 14th, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/13-375-helical-pipe-piles-300-megawatt-solar-project-alberta)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/86-DELANCEY-5.jpg?width=600&height=800&name=86-DELANCEY-5.jpg)

### A Boring Story – How to Save 6 Weeks, 50 Foot, and $500,000.00

 August 3rd, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/1972-2)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/draper2.jpg?width=640&height=480&name=draper2.jpg)

### NYC – 126 STELCOR® Piles to 75’ for a 14-Story Addition at Draper Hall

 May 1st, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/nyc-126-stelcor-micropiles-to-75-for-a-14-story-addition-at-draper-hall)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/Spiegel-Community-Center-Helical-Piles2.png?width=872&height=583&name=Spiegel-Community-Center-Helical-Piles2.png)

### 7″ Helical Pile Underpinning For A 100-Year-Old Community Center

 April 4th, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/7-helical-pile-underpinning-100-year-old-community-center)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/DSC01761-web.jpg?width=872&height=583&name=DSC01761-web.jpg)

### Cornell University – STELCOR® DDM for Increased Column Loading In The Historic Rand Hall

 March 21st, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/cornell-university-stelcor-ddm-increased-column-loading-historic-rand-hall)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/DC-SEWER-2-1024x576-2.jpg?width=1024&height=576&name=DC-SEWER-2-1024x576-2.jpg)

### Keeping it Clean in Washington D.C. With STELCOR

 February 2nd, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/keeping-it-clean-washington-d-c-stelcor)

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Bruce Stroyer",
    "url" : "https://www.idealfoundationsystems.com/blog/author/bruce-stroyer"
  },
  "dateModified" : "2025-01-20T18:54:00.135Z",
  "datePublished" : "2016-03-30T18:31:03.000Z",
  "headline" : "92 STELCOR® Piles Support Building In Poor Soil in The Bronx",
  "image" : [ "https://www.idealfoundationsystems.com/hubfs/Imported_Blog_Media/Walton.jpg" ],
  "mainEntityOfPage" : {
    "@id" : "https://www.idealfoundationsystems.com/blog/nyc-92-stelcor-micropiles-in-difficult-soils-in-the-bronx",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://www.idealfoundationsystems.com/hubfs/ASSETS/logos/Ideal-Logo.png"
    }
  }
}
```