title: NYC - East Village Homes See STELCOR Savings - IDEAL Foundation Systems
description: In New York City's East Village neighborhood, longtime residents are increasingly at risk of being displaced from a community they have helped build, and affordable housing is desperately needed. Asian Americans for Equality (AAFE), a non-profit, was selected by Housing Preservation and Development (HPD) to develop the new 14-story East Village Homes building, which will […]
image: https://www.idealfoundationsystems.com/hubfs/Imported_Blog_Media/302-east-2nd-street-exterior-rendering.jpg
---

[Skip to main content](https://www.idealfoundationsystems.com/blog/east-village-homes#maincontent)

[ «  View All Posts ](https://www.idealfoundationsystems.com/learning-center/)

# NYC – East Village Homes See STELCOR Savings

 January 21st, 2020

 1 min read

 By [Bruce Stroyer](https://www.idealfoundationsystems.com/blog/author/bruce-stroyer)

![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/302-east-2nd-street-exterior-rendering.jpg?width=736&height=401&name=302-east-2nd-street-exterior-rendering.jpg)

In New York City’s East Village neighborhood, longtime residents are increasingly at risk of being displaced from a community they have helped build, and affordable housing is desperately needed. Asian Americans for Equality (AAFE), a non-profit, was selected by Housing Preservation and Development (HPD) to develop the new 14-story East Village Homes building, which will include apartments for very low, low, and moderate-income households.

![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/2-M302E-Ideal-Material-Lo-Res-1024x484-1.jpg?width=734&height=346&name=2-M302E-Ideal-Material-Lo-Res-1024x484-1.jpg)

A traditional micropile spec for this building could have cost twice as much for material in addition to installation costs. The most significant foundation installation challenge was limited access. The project is on a small, narrow urban lot with adjacent buildings on either side. A new foundation needed to be installed next to existing foundations where vibration and disturbance were concerns.

![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/3-M302E-EMC-Drill-Access-LoRes.jpg?width=729&height=354&name=3-M302E-EMC-Drill-Access-LoRes.jpg)

Ideal Group worked with Environmental Management Consultants, Inc. (EMC) to provide Stelcor Drilled Displacement Micropiles (DDM) as a cost-saving solution, which caused no disturbance to the foundation of the adjacent buildings. Over 20 days, the EMC team installed 167 piles to 34 feet. This value-engineered alternate cut foundation costs in half, passing the savings onto the non-profit AAFE, to help with the project’s budgeting.

The interdisciplinary pile team worked very closely to be responsive, to accommodate existing site conditions, and to coordinate with the general contractor’s other trades. The pile layout had to be adjusted to account for adjacent infrastructure and limited access to pile locations. Pile loading is 100 tons ultimate compression and 6 tons ultimate lateral.

![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/302-east-2nd-street-exterior-rendering.jpg?width=736&height=401&name=302-east-2nd-street-exterior-rendering.jpg)

Rendering via Leroy Street Studio

![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/East-Village-Homes-Groundbreaking-1200x801-1.jpeg?width=730&height=487&name=East-Village-Homes-Groundbreaking-1200x801-1.jpeg)

 Topics:

[ Case Study ](https://www.idealfoundationsystems.com/blog/topic/case-study)

 Don't forget to share this post:

<https://www.facebook.com/sharer/sharer.php?u=https://www.idealfoundationsystems.com/blog/east-village-homes> <https://www.linkedin.com/shareArticle?url=https://www.idealfoundationsystems.com/blog/east-village-homes&title=NYC+-+East+Village+Homes+See+STELCOR+Savings+-+IDEAL+Foundation+Systems&summary=In+New+York+City%27s+East+Village+neighborhood%2C+longtime+residents+are+increasingly+at+risk+of+being+displaced+from+a+community+they+have+helped+build%2C+and+affordable+housing+is+desperately+needed.+Asian+Americans+for+Equality+%28AAFE%29%2C+a+non-profit%2C+was+selected+by+Housing+Preservation+and+Development+%28HPD%29+to+develop+the+new+14-story+East+Village+Homes+building%2C+which+will+%5B%E2%80%A6%5D> <https://twitter.com/intent/tweet?text=NYC+-+East+Village+Homes+See+STELCOR+Savings+-+IDEAL+Foundation+Systems&url=https://www.idealfoundationsystems.com/blog/east-village-homes> <https://pinterest.com/pin/create/button/?url=https://www.idealfoundationsystems.com/blog/east-village-homes&media=https://47216011.fs1.hubspotusercontent-na1.net/hubfs/47216011/Imported_Blog_Media/302-east-2nd-street-exterior-rendering.jpg&description=In+New+York+City%27s+East+Village+neighborhood%2C+longtime+residents+are+increasingly+at+risk+of+being+displaced+from+a+community+they+have+helped+build%2C+and+affordable+housing+is+desperately+needed.+Asian+Americans+for+Equality+%28AAFE%29%2C+a+non-profit%2C+was+selected+by+Housing+Preservation+and+Development+%28HPD%29+to+develop+the+new+14-story+East+Village+Homes+building%2C+which+will+%5B%E2%80%A6%5D>

## Related Articles

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Baltic%20St_.png?width=713&height=401&name=Baltic%20St_.png)

### STELCOR Supports a Complex Development Site in Brooklyn’s Gowanus Neighborhood

 May 18th, 2026|1 min read 

](https://www.idealfoundationsystems.com/blog/stelcor-supports-a-complex-development-site-in-brooklyns-gowanus-neighborhood)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/16-777x246.jpg?width=777&height=246&name=16-777x246.jpg)

### STELCOR Piles Installed Adjacent to Elevated MTA for Lorimer House Project

 May 18th, 2026|1 min read 

](https://www.idealfoundationsystems.com/blog/stelcor-piles-installed-adjacent-to-elevated-mta-for-lorimer-house-project)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/image-webp.webp?width=1350&height=900&name=image-webp.webp)

### NYC - 272 STELCOR Piles Installed for a 14-Story Development in Gowanus

 August 1st, 2025|1 min read 

](https://www.idealfoundationsystems.com/blog/nyc-272-stelcor-piles-installed-for-a-14-story-development-in-gowanus)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/86%20DELANCEY%20web(16)--jpg.jpeg?width=720&height=471&name=86%20DELANCEY%20web(16)--jpg.jpeg)

### NYC - 112 STELCOR® Piles to 30' for a 12-Story Mixed-Use Rental Building

 June 23rd, 2025|1 min read 

](https://www.idealfoundationsystems.com/blog/nyc-112-stelcor-piles-to-30-for-a-12-story-mixed-use-rental-building)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/INSTALL-SNIP-2-WEB.jpg?width=720&height=404&name=INSTALL-SNIP-2-WEB.jpg)

### 5.5″ HELICAL PILES FOR A HOSPITAL PARKING GARAGE RETROFIT

 December 28th, 2022|1 min read 

](https://www.idealfoundationsystems.com/blog/5-5-helical-piles-for-a-parking-garage-retrofit)

[![STELCOR® DDMS TOUCHING DOWN AT JFK AIRPORT](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/20220617_140517-WEB-scaled.jpg?width=2560&height=1920&name=20220617_140517-WEB-scaled.jpg)

### STELCOR® DDMS TOUCHING DOWN AT JFK AIRPORT

 October 31st, 2022|1 min read 

](https://www.idealfoundationsystems.com/blog/stelcor-at-jfk)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/install-gap-2.jpg?width=2400&height=1354&name=install-gap-2.jpg)

### 42 STELCOR® DDMS FOR WIND TURBINES IN CALIFORNIA

 July 25th, 2022|1 min read 

](https://www.idealfoundationsystems.com/blog/42-stelcor-ddms-for-wind-turbines-in-california)

[![FLYING EXCAVATORS AND STELCOR DDM’S AT A PAPER MILL IN DULUTH, MN](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/duluth-3-web-1.jpg?width=900&height=505&name=duluth-3-web-1.jpg)

### FLYING EXCAVATORS AND STELCOR DDM’S AT A PAPER MILL IN DULUTH, MN

 June 29th, 2022|1 min read 

](https://www.idealfoundationsystems.com/blog/flying-excavators-and-stelcor-ddms-at-a-paper-mill-in-duluth-mn)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/20210611_100954-WEB.jpg?width=2048&height=1536&name=20210611_100954-WEB.jpg)

### 93 STELCOR DDM’S INSTALLED FOR A 7-STORY HOSPITAL ADDITION

 March 3rd, 2022|1 min read 

](https://www.idealfoundationsystems.com/blog/93-stelcor-ddms-installed-for-a-7-story-hospital-addition)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/DSC00162-1.jpg?width=872&height=583&name=DSC00162-1.jpg)

### NYC – 75 STELCOR Piles for 8-Story Cantilevered Condos

 July 30th, 2021|1 min read 

](https://www.idealfoundationsystems.com/blog/nyc-75-stelcor-piles-8-story-cantilevered-condos)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/DC-SEWER-2-150x150-1-1.jpg?width=150&height=150&name=DC-SEWER-2-150x150-1-1.jpg)

### Keeping it Clean in Washington D.C. With STELCOR

 February 11th, 2021|1 min read 

](https://www.idealfoundationsystems.com/blog/keeping-clean-washington-d-c-stelcor)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/PATH-WEB-1.jpg?width=436&height=325&name=PATH-WEB-1.jpg)

### On the beaten PATH: More IDEAL Helical Piles In The NY/NJ Subway Stations

 October 8th, 2020|1 min read 

](https://www.idealfoundationsystems.com/blog/on-the-beaten-path-more-ideal-helical-piles-in-the-ny-nj-subway-stations)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/FNC-rendering-web-150x150-1.png?width=150&height=150&name=FNC-rendering-web-150x150-1.png)

### STELCOR For The First National Center

 August 10th, 2020|1 min read 

](https://www.idealfoundationsystems.com/blog/stelcor-for-the-first-national-center)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/CHSB-26.jpg?width=900&height=506&name=CHSB-26.jpg)

### Helical Pile Foundations for COVID-19 Field Hospitals in New York

 May 1st, 2020|1 min read 

](https://www.idealfoundationsystems.com/blog/helical-pile-foundations-for-covid-19-field-hospitals-in-new-york)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/IMG_1908-resize.jpg?width=640&height=480&name=IMG_1908-resize.jpg)

### IDEAL Helical Piles at the naval academy

 September 17th, 2019|1 min read 

](https://www.idealfoundationsystems.com/blog/ideal-helical-piles-at-naval-academy)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/lincoln-terminal-helical-piles-night.jpg?width=576&height=324&name=lincoln-terminal-helical-piles-night.jpg)

### 1,321 Helical Pipe Piles for Lincoln Terminal in Natchez

 September 13th, 2019|1 min read 

](https://www.idealfoundationsystems.com/blog/1321-helical-pipe-piles-for-lincoln-terminal-in-natchez)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/NYHC-awards_DraperHall_image4-910x1024-910x1024-1.jpg?width=910&height=1024&name=NYHC-awards_DraperHall_image4-910x1024-910x1024-1.jpg)

### 295 STELCOR® DDM for the new 16-Story Gilbert in NYC

 March 9th, 2019|1 min read 

](https://www.idealfoundationsystems.com/blog/its-gonna-be-a-gilbert)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/Blackspring-Ridge-Wind-Project-Vickars-Image-7.jpg?width=640&height=360&name=Blackspring-Ridge-Wind-Project-Vickars-Image-7.jpg)

### 13.375″ Helical Pipe Piles For Western Canadas Largest Wind Project

 December 14th, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/13-375-helical-pipe-piles-300-megawatt-solar-project-alberta)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/86-DELANCEY-5.jpg?width=600&height=800&name=86-DELANCEY-5.jpg)

### A Boring Story – How to Save 6 Weeks, 50 Foot, and $500,000.00

 August 3rd, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/1972-2)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/draper2.jpg?width=640&height=480&name=draper2.jpg)

### NYC – 126 STELCOR® Piles to 75’ for a 14-Story Addition at Draper Hall

 May 1st, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/nyc-126-stelcor-micropiles-to-75-for-a-14-story-addition-at-draper-hall)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/Spiegel-Community-Center-Helical-Piles2.png?width=872&height=583&name=Spiegel-Community-Center-Helical-Piles2.png)

### 7″ Helical Pile Underpinning For A 100-Year-Old Community Center

 April 4th, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/7-helical-pile-underpinning-100-year-old-community-center)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/DSC01761-web.jpg?width=872&height=583&name=DSC01761-web.jpg)

### Cornell University – STELCOR® DDM for Increased Column Loading In The Historic Rand Hall

 March 21st, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/cornell-university-stelcor-ddm-increased-column-loading-historic-rand-hall)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/DC-SEWER-2-1024x576-2.jpg?width=1024&height=576&name=DC-SEWER-2-1024x576-2.jpg)

### Keeping it Clean in Washington D.C. With STELCOR

 February 2nd, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/keeping-it-clean-washington-d-c-stelcor)

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Bruce Stroyer",
    "url" : "https://www.idealfoundationsystems.com/blog/author/bruce-stroyer"
  },
  "dateModified" : "2024-11-20T16:55:45.964Z",
  "datePublished" : "2020-01-21T17:59:33.000Z",
  "headline" : "NYC - East Village Homes See STELCOR Savings - IDEAL Foundation Systems",
  "image" : [ "https://www.idealfoundationsystems.com/hubfs/Imported_Blog_Media/302-east-2nd-street-exterior-rendering.jpg" ],
  "mainEntityOfPage" : {
    "@id" : "https://www.idealfoundationsystems.com/blog/east-village-homes",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://www.idealfoundationsystems.com/hubfs/ASSETS/logos/Ideal-Logo.png"
    }
  }
}
```