# NYC – 126 STELCOR® Piles to 75’ for a 14-Story Addition at Draper Hall

 May 1st, 2018

 1 min read

 By [Bruce Stroyer](https://www.idealfoundationsystems.com/blog/author/bruce-stroyer)

![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/draper2.jpg?width=640&height=480&name=draper2.jpg)

*ZERO SPOILS REMOVED AND A FASTER INSTALL TIME IN A LIMITED ACCESS AREA WITH STELCOR*

**OVERVIEW:**

The 14-story Draper Hall, located between Metropolitan Hospital and the East River, combines new construction with substantial rehab to an existing structure. The tower footprint was expanded to allow for double loaded corridors, 201 apartments, and a community center for the city’s underserved seniors.

 

![vlcsnap-2016-01-15-07h32m36s925](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/vlcsnap-2016-01-15-07h32m36s925-300x168-1.png?width=300&height=168&name=vlcsnap-2016-01-15-07h32m36s925-300x168-1.png)![IMG_20150619_131309](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/IMG_20150619_131309-300x168-1.jpg?width=300&height=168&name=IMG_20150619_131309-300x168-1.jpg)

**CHALLENGE:**

The project was originally spec’d with 12 3/4” micropiles using the traditional installation method and limited access was a concern. Also, the owner needed the piles to be installed quickly in order to stay within the schedule. Furthermore, contaminated soils were present and the cost of removing spoils was a significant concern.

![vlcsnap-2016-01-14-14h44m52s333](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/vlcsnap-2016-01-14-14h44m52s333-300x168-1.png?width=300&height=168&name=vlcsnap-2016-01-14-14h44m52s333-300x168-1.png)![vlcsnap-2016-01-14-14h53m06s843](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/vlcsnap-2016-01-14-14h53m06s843-300x168-1.png?width=300&height=168&name=vlcsnap-2016-01-14-14h53m06s843-300x168-1.png)

**SOLUTION:**

[IDEAL Group](https://www.idealfoundationsystems.com/) worked with Posillico to offer STELCOR Drilled-In Displacement Piles as a cost saving alternate solution on this project. Faster install time meant the project stayed within the schedule. No spoils are created when installing STELCOR piles. This resulted in a significant cost savings. Installation in the limited access area was simplified because minimal equipment is needed to install Stelcor Drilled-In Displacement Piles.

**[VIEW/DOWNLOAD GEOTECHNICAL REPORTS AND LOAD TEST RESULTS](https://www.idealfoundationsystems.com/hubfs/CASE%20STUDY/STELCOR%20-%20DC%20WATER%20&%20SEWER%20-%20Complete.pdf)**

**OWNER:**  
SKA Marin  
Great Neck, NY

**GENERAL CONTRACTOR:**  
Procida Construction Corp.  
Bronx, NY

**INSTALLER:**  
Posillico Drilling, Inc.  
College Point, NY

**STRUCTURAL ENGINEER:**  
Rodney D Gibble Consulting Engineers  
New York, NY

**GEOTECHNICAL ENGINEER:**  
GZA GeoEnvironmental Inc.  
New York, NY

**CIVIL ENGINEER:**  
Yu & Associates  
Elmwood Park, NJ

**ARCHITECT:**  
Dattner Architects  
New York, NY

**LOADS:**  
85 tons compression (design load)  
50 tons tension (design load)

**SPECIFICATIONS:**  
5.5” pile shaft  
.476 wall thickness 80 ksi  
16” tip or drive plate  
14” corrugated grout column  
9” solid grout column  
8” reverse auger

**SOILS + EMBEDMENT DEPTH:**  
75’ and 6” into pile cap

**TIME FRAME:**  
21 days – (6) 75’ piles per shift

[See how Stelcor Drilled-In Displacement Micropiles can save you time and money on your next project.](https://www.idealfoundationsystems.com/stelcor-products/)

 Topics:

[ Case Study ](https://www.idealfoundationsystems.com/blog/topic/case-study)

[ Drilled-In Displacement Piles (DDM) ](https://www.idealfoundationsystems.com/blog/topic/drilled-in-displacement-piles-ddm)

[ STELCOR ](https://www.idealfoundationsystems.com/blog/topic/stelcor)

 Don't forget to share this post:

<https://www.facebook.com/sharer/sharer.php?u=https://www.idealfoundationsystems.com/blog/nyc-126-stelcor-micropiles-to-75-for-a-14-story-addition-at-draper-hall> <https://www.linkedin.com/shareArticle?url=https://www.idealfoundationsystems.com/blog/nyc-126-stelcor-micropiles-to-75-for-a-14-story-addition-at-draper-hall&title=126+STELCOR%C2%AE+Piles+Installed+to+Expand+Draper+Hall&summary=Draper+Hall+expansion+in+progress%2C+and+zero+spoils+removed+as+well+as+a+faster+install+time+in+a+limited+access+area+with+Stelcor+micropiles.> <https://twitter.com/intent/tweet?text=126+STELCOR%C2%AE+Piles+Installed+to+Expand+Draper+Hall&url=https://www.idealfoundationsystems.com/blog/nyc-126-stelcor-micropiles-to-75-for-a-14-story-addition-at-draper-hall> <https://pinterest.com/pin/create/button/?url=https://www.idealfoundationsystems.com/blog/nyc-126-stelcor-micropiles-to-75-for-a-14-story-addition-at-draper-hall&media=https://47216011.fs1.hubspotusercontent-na1.net/hubfs/47216011/Imported_Blog_Media/draper2.jpg&description=Draper+Hall+expansion+in+progress%2C+and+zero+spoils+removed+as+well+as+a+faster+install+time+in+a+limited+access+area+with+Stelcor+micropiles.>

## Related Articles

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Baltic%20St_.png?width=713&height=401&name=Baltic%20St_.png)

### STELCOR Supports a Complex Development Site in Brooklyn’s Gowanus Neighborhood

 May 18th, 2026|1 min read 

](https://www.idealfoundationsystems.com/blog/stelcor-supports-a-complex-development-site-in-brooklyns-gowanus-neighborhood)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/16-777x246.jpg?width=777&height=246&name=16-777x246.jpg)

### STELCOR Piles Installed Adjacent to Elevated MTA for Lorimer House Project

 May 18th, 2026|1 min read 

](https://www.idealfoundationsystems.com/blog/stelcor-piles-installed-adjacent-to-elevated-mta-for-lorimer-house-project)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/image-webp.webp?width=1350&height=900&name=image-webp.webp)

### NYC - 272 STELCOR Piles Installed for a 14-Story Development in Gowanus

 August 1st, 2025|1 min read 

](https://www.idealfoundationsystems.com/blog/nyc-272-stelcor-piles-installed-for-a-14-story-development-in-gowanus)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/86%20DELANCEY%20web(16)--jpg.jpeg?width=720&height=471&name=86%20DELANCEY%20web(16)--jpg.jpeg)

### NYC - 112 STELCOR® Piles to 30' for a 12-Story Mixed-Use Rental Building

 June 23rd, 2025|1 min read 

](https://www.idealfoundationsystems.com/blog/nyc-112-stelcor-piles-to-30-for-a-12-story-mixed-use-rental-building)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/INSTALL-SNIP-2-WEB.jpg?width=720&height=404&name=INSTALL-SNIP-2-WEB.jpg)

### 5.5″ HELICAL PILES FOR A HOSPITAL PARKING GARAGE RETROFIT

 December 28th, 2022|1 min read 

](https://www.idealfoundationsystems.com/blog/5-5-helical-piles-for-a-parking-garage-retrofit)

[![STELCOR® DDMS TOUCHING DOWN AT JFK AIRPORT](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/20220617_140517-WEB-scaled.jpg?width=2560&height=1920&name=20220617_140517-WEB-scaled.jpg)

### STELCOR® DDMS TOUCHING DOWN AT JFK AIRPORT

 October 31st, 2022|1 min read 

](https://www.idealfoundationsystems.com/blog/stelcor-at-jfk)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/install-gap-2.jpg?width=2400&height=1354&name=install-gap-2.jpg)

### 42 STELCOR® DDMS FOR WIND TURBINES IN CALIFORNIA

 July 25th, 2022|1 min read 

](https://www.idealfoundationsystems.com/blog/42-stelcor-ddms-for-wind-turbines-in-california)

[![FLYING EXCAVATORS AND STELCOR DDM’S AT A PAPER MILL IN DULUTH, MN](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/duluth-3-web-1.jpg?width=900&height=505&name=duluth-3-web-1.jpg)

### FLYING EXCAVATORS AND STELCOR DDM’S AT A PAPER MILL IN DULUTH, MN

 June 29th, 2022|1 min read 

](https://www.idealfoundationsystems.com/blog/flying-excavators-and-stelcor-ddms-at-a-paper-mill-in-duluth-mn)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/20210611_100954-WEB.jpg?width=2048&height=1536&name=20210611_100954-WEB.jpg)

### 93 STELCOR DDM’S INSTALLED FOR A 7-STORY HOSPITAL ADDITION

 March 3rd, 2022|1 min read 

](https://www.idealfoundationsystems.com/blog/93-stelcor-ddms-installed-for-a-7-story-hospital-addition)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/DSC00162-1.jpg?width=872&height=583&name=DSC00162-1.jpg)

### NYC – 75 STELCOR Piles for 8-Story Cantilevered Condos

 July 30th, 2021|1 min read 

](https://www.idealfoundationsystems.com/blog/nyc-75-stelcor-piles-8-story-cantilevered-condos)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/DC-SEWER-2-150x150-1-1.jpg?width=150&height=150&name=DC-SEWER-2-150x150-1-1.jpg)

### Keeping it Clean in Washington D.C. With STELCOR

 February 11th, 2021|1 min read 

](https://www.idealfoundationsystems.com/blog/keeping-clean-washington-d-c-stelcor)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/PATH-WEB-1.jpg?width=436&height=325&name=PATH-WEB-1.jpg)

### On the beaten PATH: More IDEAL Helical Piles In The NY/NJ Subway Stations

 October 8th, 2020|1 min read 

](https://www.idealfoundationsystems.com/blog/on-the-beaten-path-more-ideal-helical-piles-in-the-ny-nj-subway-stations)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/FNC-rendering-web-150x150-1.png?width=150&height=150&name=FNC-rendering-web-150x150-1.png)

### STELCOR For The First National Center

 August 10th, 2020|1 min read 

](https://www.idealfoundationsystems.com/blog/stelcor-for-the-first-national-center)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/CHSB-26.jpg?width=900&height=506&name=CHSB-26.jpg)

### Helical Pile Foundations for COVID-19 Field Hospitals in New York

 May 1st, 2020|1 min read 

](https://www.idealfoundationsystems.com/blog/helical-pile-foundations-for-covid-19-field-hospitals-in-new-york)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/302-east-2nd-street-exterior-rendering.jpg?width=736&height=401&name=302-east-2nd-street-exterior-rendering.jpg)

### NYC – East Village Homes See STELCOR Savings

 January 21st, 2020|1 min read 

](https://www.idealfoundationsystems.com/blog/east-village-homes)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/IMG_1908-resize.jpg?width=640&height=480&name=IMG_1908-resize.jpg)

### IDEAL Helical Piles at the naval academy

 September 17th, 2019|1 min read 

](https://www.idealfoundationsystems.com/blog/ideal-helical-piles-at-naval-academy)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/lincoln-terminal-helical-piles-night.jpg?width=576&height=324&name=lincoln-terminal-helical-piles-night.jpg)

### 1,321 Helical Pipe Piles for Lincoln Terminal in Natchez

 September 13th, 2019|1 min read 

](https://www.idealfoundationsystems.com/blog/1321-helical-pipe-piles-for-lincoln-terminal-in-natchez)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/NYHC-awards_DraperHall_image4-910x1024-910x1024-1.jpg?width=910&height=1024&name=NYHC-awards_DraperHall_image4-910x1024-910x1024-1.jpg)

### 295 STELCOR® DDM for the new 16-Story Gilbert in NYC

 March 9th, 2019|1 min read 

](https://www.idealfoundationsystems.com/blog/its-gonna-be-a-gilbert)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/Blackspring-Ridge-Wind-Project-Vickars-Image-7.jpg?width=640&height=360&name=Blackspring-Ridge-Wind-Project-Vickars-Image-7.jpg)

### 13.375″ Helical Pipe Piles For Western Canadas Largest Wind Project

 December 14th, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/13-375-helical-pipe-piles-300-megawatt-solar-project-alberta)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/86-DELANCEY-5.jpg?width=600&height=800&name=86-DELANCEY-5.jpg)

### A Boring Story – How to Save 6 Weeks, 50 Foot, and $500,000.00

 August 3rd, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/1972-2)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/Spiegel-Community-Center-Helical-Piles2.png?width=872&height=583&name=Spiegel-Community-Center-Helical-Piles2.png)

### 7″ Helical Pile Underpinning For A 100-Year-Old Community Center

 April 4th, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/7-helical-pile-underpinning-100-year-old-community-center)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/DSC01761-web.jpg?width=872&height=583&name=DSC01761-web.jpg)

### Cornell University – STELCOR® DDM for Increased Column Loading In The Historic Rand Hall

 March 21st, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/cornell-university-stelcor-ddm-increased-column-loading-historic-rand-hall)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/DC-SEWER-2-1024x576-2.jpg?width=1024&height=576&name=DC-SEWER-2-1024x576-2.jpg)

### Keeping it Clean in Washington D.C. With STELCOR

 February 2nd, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/keeping-it-clean-washington-d-c-stelcor)

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Bruce Stroyer",
    "url" : "https://www.idealfoundationsystems.com/blog/author/bruce-stroyer"
  },
  "dateModified" : "2025-01-20T19:06:53.543Z",
  "datePublished" : "2018-05-01T21:13:21.000Z",
  "headline" : "126 STELCOR® Piles Installed to Expand Draper Hall",
  "image" : [ "https://www.idealfoundationsystems.com/hubfs/Imported_Blog_Media/draper2.jpg" ],
  "mainEntityOfPage" : {
    "@id" : "https://www.idealfoundationsystems.com/blog/nyc-126-stelcor-micropiles-to-75-for-a-14-story-addition-at-draper-hall",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://www.idealfoundationsystems.com/hubfs/ASSETS/logos/Ideal-Logo.png"
    }
  }
}
```