Skip to main content

Kelsey Stroyer

Case Study | Drilled-In Displacement Piles (DDM) | STELCOR | No Spoils

STELCOR Installation in a limited-access site in Brooklyn, NY

July 23rd, 2026|1 min read

Case Study | Drilled-In Displacement Piles (DDM) | STELCOR | No Spoils

Deep Foundation Support for 13-Story Affordable Housing in Lower East Side

July 23rd, 2026|1 min read

Limited Access | Case Study | Drilled-In Displacement Piles (DDM) | STELCOR | No Spoils

STELCOR Supports a Complex Development Site in Brooklyn’s Gowanus Neighborhood

May 18th, 2026|1 min read

Case Study | Drilled-In Displacement Piles (DDM) | STELCOR

STELCOR Piles Installed Adjacent to Elevated MTA for Lorimer House Project

May 18th, 2026|1 min read

Case Study | Drilled-In Displacement Piles (DDM) | STELCOR

NYC - 272 STELCOR Piles Installed for a 14-Story Development in Gowanus

August 1st, 2025|1 min read

Limited Access | Case Study | Drilled-In Displacement Piles (DDM) | STELCOR

NYC - 112 STELCOR® Piles to 30' for a 12-Story Mixed-Use Rental Building

June 23rd, 2025|1 min read