by Bruce Stroyer | Mar 3, 2022 | Case Study, Micropiles, Stelcor Case Study, Stelcor®
OVERVIEW:The Highland Hospital Patient Tower Project will take three years to complete and will open in the spring of 2023. The project will add five additional stories to the existing 2-story southeast wing and join the south and southeast wings with a 7-story...
by Bruce Stroyer | Oct 19, 2021 | Uncategorized
As we all know, a multi-story century-old brick facade with no building behind it is not going to be the most steady structure. The possibility of vibrations strikes fear in any sensible person. Enter.. helical piles. As part of the West End Ironworks redevelopment...
by Bruce Stroyer | Sep 3, 2021 | Helical Case Study, Helical Piles, HELICAL SOE
This project in the Bronx, the IDEAL Design Team recommended a 12.75” x .500” W.T. helical pipe pile with a 22” x .75” helix as an alternate to drilling, dropping, and grouting, H-Piles. A total of 18 helical pipe piles were installed over 2 days. Each pile section...