IDEAL Foundation Systems

800-789-4810

  • Products
    • Stelcor
    • Helical Piles
      • Helical Pile Cut Sheet
    • Brackets & Accessories
    • Installation Equipment
  • Resources
    • Types of Foundations
    • Downloads
    • Videos
    • Client Resources
    • Privacy Policy
  • About
    • Why IDEAL?
    • Careers
  • News
  • Contact Us
  • Get a Quote
Select Page
STELCOR® DDMS TOUCHING DOWN AT JFK AIRPORT

STELCOR® DDMS TOUCHING DOWN AT JFK AIRPORT

by Bruce Stroyer | Oct 31, 2022 | Case Study, Micropiles, Stelcor Case Study, Stelcor®

VIEW/DOWNLOAD CASE STUDY INCLUDING  SOILS REPORT AND LOAD TEST DATA (PDF) OVERVIEW:Another successful STELCOR install at JFK Airport in New York City. This time around, we had the opportunity to provide a deep foundation solution for the expansion of the terminal 4...
42 STELCOR® DDMS FOR WIND TURBINES IN CALIFORNIA

42 STELCOR® DDMS FOR WIND TURBINES IN CALIFORNIA

by Bruce Stroyer | Jul 25, 2022 | Case Study, Micropiles, Stelcor Case Study, Stelcor®

VIEW/DOWNLOAD CASE STUDY INCLUDING  SOILS REPORT AND LOAD TEST DATA (PDF) OVERVIEW:Dole’s salad processing plant in Soledad, CA, recently began a $10 million project to install two wind turbines. The turbines will provide power to the facility to aid Dole in...
FLYING EXCAVATORS AND STELCOR DDM’S AT A PAPER MILL IN DULUTH, MN

FLYING EXCAVATORS AND STELCOR DDM’S AT A PAPER MILL IN DULUTH, MN

by Bruce Stroyer | Jun 29, 2022 | Case Study, Micropiles, Stelcor Case Study, Stelcor®

OVERVIEW:ST Paper & Tissue acquired its Duluth, MN location in early 2021 and began a $54 million overhaul of the facilities shortly after. Scheduled to open in the fall of 2022, the upgraded paper and tissue mill will allow for increased automation and further...
93 STELCOR DDM’S INSTALLED FOR A 7-STORY HOSPITAL ADDITION

93 STELCOR DDM’S INSTALLED FOR A 7-STORY HOSPITAL ADDITION

by Bruce Stroyer | Mar 3, 2022 | Case Study, Micropiles, Stelcor Case Study, Stelcor®

OVERVIEW:The Highland Hospital Patient Tower Project will take three years to complete and will open in the spring of 2023. The project will add five additional stories to the existing 2-story southeast wing and join the south and southeast wings with a 7-story...

NYC – 75 STELCOR Piles for 8-Story Cantilevered Condos

by Bruce Stroyer | Jul 30, 2021 | Case Study, Micropiles, Stelcor Case Study, Stelcor®

  OVERVIEW: After a decade of waiting, this 8-story building is finally going vertical. This striking cantilivered ground-up structure is located in the heart of NYC’s East Village neighborhood.  Designed by HTO-Architect for Colonnade Group, the...
Keeping it Clean in Washington D.C. With STELCOR

Keeping it Clean in Washington D.C. With STELCOR

by Bruce Stroyer | Feb 11, 2021 | Case Study, Micropiles, Stelcor Case Study, Stelcor®

OVERVIEW: The Clean Rivers Project is DC Water’s ongoing program to reduce combined sewer overflows into the District’s waterways. The Project is a massive infrastructure and support program designed to capture and clean wastewater during rainfalls before it ever...
« Older Entries

Categories

  • Case Study
  • Helical Case Study
  • Helical Historic Preservation
  • Helical Piles
  • HELICAL SOE
  • ICC-ES
  • Micropiles
  • News
  • Opportunities
  • Remote Control Pile Installation
  • Screw Piles
  • Stelcor Case Study
  • Stelcor®
  • Stelcor® Historic Preservation
  • Uncategorized

Manufacturing Plant

999 Picture Pkwy
Webster, NY 14580

Corporate Office

80 Bluff Dr
East Rochester, NY 14445

Contact Us

Toll Free: 800-789-4810
Main: 585-872-7190
Fax: 585-872-3032

  • LinkedIn
  • Vimeo
  • YouTube

© 2023 By IDEAL Foundation Systems

Internet Marketing Solution & Design by Cazbah