IDEAL Foundation Systems

800-789-4810

  • Products
    • Stelcor
    • Helical Piles
      • Helical Pile Cut Sheet
    • Brackets & Accessories
    • Installation Equipment
  • Resources
    • Types of Foundations
    • Downloads
    • Videos
    • Client Resources
    • Privacy Policy
  • About
    • Why IDEAL?
    • Careers
  • News
  • Contact Us
  • Get a Quote
Select Page
REMOTE-CONTROLLED DEMOLITION EQUIPMENT SOLVES CHALLENGING HELICAL PIER INSTALLATION

REMOTE-CONTROLLED DEMOLITION EQUIPMENT SOLVES CHALLENGING HELICAL PIER INSTALLATION

by Bruce Stroyer | Mar 10, 2023 | Helical Case Study, Helical Piles, Remote Control Pile Installation

Image Credit: Brokk/Drilling Service Co. When it comes to deep foundation systems, helical piers are gaining traction with contractors across the country. This anchoring method offers minimal ground disturbance and leaves no spoils. There’s also no cure time involved,...
5.5″ HELICAL PILES FOR A HOSPITAL PARKING GARAGE RETROFIT

5.5″ HELICAL PILES FOR A HOSPITAL PARKING GARAGE RETROFIT

by Bruce Stroyer | Dec 28, 2022 | Case Study, Helical Case Study, Helical Piles

OVERVIEW:Earlier this year, a $92 million expansion project started at Saint Joseph’s Hospital in Syracuse, NY. Part of this project involved the conversion of an existing 7-story parking garage into space for additional patient rooms and a Women’s...
12.75″ helical pipe piles for soe in the Bronx

12.75″ helical pipe piles for soe in the Bronx

by Bruce Stroyer | Aug 17, 2022 | Helical Case Study, Helical Piles, HELICAL SOE

VIEW/DOWNLOAD CASE STUDY INCLUDING SOILS REPORT (PDF) OVERVIEW:In late 2020, Family Life Academy and Charter School(FLACS) closed on the largest tax-exempt bond for a charter school operator in New York City’s history. The $126.4 million transaction will include...
KEEPING UP A FACADE – ITHACA, NY

KEEPING UP A FACADE – ITHACA, NY

by Bruce Stroyer | Oct 19, 2021 | Helical Case Study, Helical Historic Preservation, Helical Piles

As we all know, a multi-story century-old brick facade with no building behind it is not going to be the most steady structure. The possibility of vibrations strikes fear in any sensible person. Enter.. helical piles. As part of the West End Ironworks redevelopment...
Helical Piles In An Active Stone Mine

Helical Piles In An Active Stone Mine

by Bruce Stroyer | May 4, 2021 | Helical Case Study, Helical Piles

OVERVIEW: The Gads Hill Mine in Piedmont, Missouri is owned by CertainTeed/Saint Gobain, one of the world’s largest manufacturers of building materials. This project consisted of updates to the primary crusher within the mine. As these updates took place, loads were...
On the beaten PATH: More IDEAL Helical Piles In The NY/NJ Subway Stations

On the beaten PATH: More IDEAL Helical Piles In The NY/NJ Subway Stations

by Bruce Stroyer | Oct 8, 2020 | Case Study, Helical Case Study, Helical Piles, Screw Piles

The helical piles had to be installed in an existing subway station, so limited access was a significant challenge. Construction is underway at the Exchange Place and Newport PATH stations in Jersey City. Renovations are being made to the existing infrastructure to...
« Older Entries

Categories

  • Case Study
  • Helical Case Study
  • Helical Historic Preservation
  • Helical Piles
  • HELICAL SOE
  • ICC-ES
  • Micropiles
  • News
  • Opportunities
  • Remote Control Pile Installation
  • Screw Piles
  • Stelcor Case Study
  • Stelcor®
  • Stelcor® Historic Preservation
  • Uncategorized

Manufacturing Plant

999 Picture Pkwy
Webster, NY 14580

Corporate Office

80 Bluff Dr
East Rochester, NY 14445

Contact Us

Toll Free: 800-789-4810
Main: 585-872-7190
Fax: 585-872-3032

  • LinkedIn
  • Vimeo
  • YouTube

© 2023 By IDEAL Foundation Systems

Internet Marketing Solution & Design by Cazbah