by Bruce Stroyer | Feb 12, 2019 | Stelcor Case Study, Stelcor®
OVERVIEW: Global shipping delivery provider DHL needed to add a mezzanine level to its existing warehouse at John F. Kennedy International Airport in Queens, New York, to expand its package handling and sorting center. The warehouse needed to remain clean...
by Bruce Stroyer | Jan 9, 2019 | Stelcor Case Study
OVERVIEW: Cool Condos Cantilevered With Calm And Confidence. Try to say that heading as fast as you can 10 times – or don’t. After a decade of waiting, this 8-story building is finally going vertical. This striking cantilivered ground-up...
by Bruce Stroyer | Aug 3, 2018 | Case Study, Micropiles, Stelcor Case Study, Stelcor®
By boring, we mean a soil boring plays a part in this story. What isn’t boring is how the general contractor in this story reduced the pile depth from 80’ to 30’ and in turn, saved over $500,000.00 and shaved 6 weeks off the project schedule by using...
by Bruce Stroyer | May 1, 2018 | Stelcor®
OVERVIEW: The 14-story Draper Hall, located between Metropolitan Hospital and the East River, combines new construction with substantial rehab to an existing structure. The tower footprint was expanded to allow for double loaded corridors, 201 apartments, and a...
by Bruce Stroyer | Jan 17, 2018 | Stelcor Case Study
OVERVIEW: In Chicago, a 60-foot tall movie theater was sold to a Banner Real Estate Group, who are converting it into a climate-controlled storage facility. This project will add five floors to the building, as well as an addition for elevators,...