by Bruce Stroyer | Jan 17, 2018 | Stelcor Case Study
OVERVIEW: In Chicago, a 60-foot tall movie theater was sold to a Banner Real Estate Group, who are converting it into a climate-controlled storage facility. This project will add five floors to the building, as well as an addition for elevators,...
by Bruce Stroyer | Nov 6, 2015 | Case Study, Stelcor Case Study
OVERVIEW: Two 5 and 7 story buildings are being built in by the NYC Department of Housing Preservation and Development (HPD) in the Bronx. Together they will contain 66 affordable housing units. CHALLENGE: Originally, 1.75” Helical Pulldown...
by Bruce Stroyer | Jul 24, 2015 | Stelcor Case Study
OVERVIEW: The boardwalk and all of the facilities at Long Beach were washed away during Hurricane Sandy. The plans for rebuilding the boardwalk included restrooms, changing rooms, lifeguard stations, and concessions at seven...
by Bruce Stroyer | Jun 2, 2015 | Stelcor Case Study
Hurricane Sandy destroyed the existing facilities on Long Beach in Long Island, NY. Construction is now underway and the 7 new structures are all supported by STELCOR DDM from IDEAL. Case study coming soon!...
by Bruce Stroyer | Mar 27, 2015 | Stelcor Case Study
OVERVIEW: The manufacturing facility needed 8 new silos and pipe racks with deep foundations to be installed at their working manufacturing facility. The project was designed for helical piles and TBH brought in the STELCOR Drilled-In Displacement Micropile as a...