OVERVIEW: A new 315-unit apartment and condo development is being built in Rochester, NY on a 26-acre parcel which borders county park land and the Irondequoit Bay. Aside from a bald eagle's nest, the site remained vacant and undeveloped for decades and was primarily...
2.875″ Helical Piles From IDEAL Foundation Systems Earn ICC-ES ESR-3750
The team at IDEAL Manufacturing, Inc. is very happy to announce the issuance of the International Code Council Evaluation Services (ICC-ES) Report ESR-3750, confirming compliance of our 2.875" helical piles with the International Building Code (IBC). Evaluation of the...
10.75″ Helical Pipe Piles for 22 Story Tower in Long Island City, NY
OVERVIEW: A 22 story multi-purpose new-build structure which included retail space on lower levels and condos and apartments on upper floors. CHALLENGE: Caissons, drilled piers and H piles were considered for this project, but due to the close proximity of the...
CASE STUDY | Tuckahoe, NY | IDEAL 8.625″ Helical Pipe Piles
OVERVIEW: Driven piles were used elsewhere on this site but due to vibration concerns and the close proximity to existing structures, torque down driven pipe piles were specified for this phase of the project. IDEAL proposed large diameter Helical Pipe Piles as an...
Have You Hugged an IDEAL Welder Today? You Should. Here’s Why…