Case Study / Stelcor
CASE STUDY | Long Beach, NY | 257 STELCOR Piles
OVERVIEW: The boardwalk and all of the facilities at Long Beach were washed away during Hurricane Sandy. The plans for rebuilding the boardwalk included restrooms, changing rooms, lifeguard stations, and concessions at seven...
Hurricane Shmurricane – Long Beach Comfort Stations Stand On STELCOR Now
Hurricane Sandy destroyed the existing facilities on Long Beach in Long Island, NY. Construction is now underway and the 7 new structures are all supported by STELCOR DDM from IDEAL. Case study coming soon!
CASE STUDY | Sunnyside, WA | IDEAL STELCOR Pile
OVERVIEW: The manufacturing facility needed 8 new silos and pipe racks with deep foundations to be installed at their working manufacturing facility. The project was designed for helical piles and TBH brought in the STELCOR Drilled-In Displacement Micropile as a...