---
title: 60 STELCOR® DDM Used For 5-Story Housing Units In Astoria
description: 60 Stelcor micropiles are now implemented to support a 5-story housing unit here in New York City. Check out our installation!
image: https://www.idealfoundationsystems.com/hubfs/Imported_Blog_Media/cropped-23rd-Street-STELCOR-Procomm-26.jpg
---

[Skip to main content](https://www.idealfoundationsystems.com/blog/nyc-60-stelcor-micropiles-for-5-story-housing-units-in-astoria#maincontent)

[ «  View All Posts ](https://www.idealfoundationsystems.com/learning-center/)

# NYC – 60 STELCOR® DDM For 5-Story Housing Units In Astoria

 January 29th, 2016

 1 min read

 By [Bruce Stroyer](https://www.idealfoundationsystems.com/blog/author/bruce-stroyer)

![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/cropped-23rd-Street-STELCOR-Procomm-26.jpg?width=593&height=448&name=cropped-23rd-Street-STELCOR-Procomm-26.jpg)

**OVERVIEW:**

A new construction, 5-story residential building in Astoria NY. Helical piles were originally specified for this project.

![23rd Street STELCOR Procomm (25)](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/23rd-Street-STELCOR-Procomm-25-225x300-2.jpg?width=225&height=300&name=23rd-Street-STELCOR-Procomm-25-225x300-2.jpg)[![23rd Street STELCOR Procomm (36)](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/23rd-Street-STELCOR-Procomm-36-225x300.jpg?width=225&height=300&name=23rd-Street-STELCOR-Procomm-36-225x300.jpg)](https://www.idealfoundationsystems.com/hubfs/Imported_Blog_Media/23rd-Street-STELCOR-Procomm-36.jpg)

**CHALLENGE:**

The developer faced several challenges at this site. The biggest concern was the high water tables present. A redesign was issued, the loading was changed, and helical piles were rejected due to the high load restrictions placed on helical piles in the NYC metro area.

**SOLUTION:**

IDEAL teamed up with Rich Anastasio to offer STELCOR Drilled-In Displacement Piles as an alternative foundation solution. STELCOR Piles were a perfect fit not only from an engineering perspective, they were much more cost effective compared to alternative piles. After a 48-hour load test at full test load, there was essentially no movement.  Engineers on site told the installer they had never seen a test that went that well.

**[DOWNLOAD THE FULL CASE STUDY HERE.](https://www.idealfoundationsystems.com/hubfs/CASE%20STUDY/STELCOR%20-%2023rd%20Street%20-%20Complete.pdf)**

[See how Stelcor Drilled-In Displacement Micropiles can save your project.](https://www.idealfoundationsystems.com/stelcor-products/)

![23rd Street STELCOR Procomm (24)](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/23rd-Street-STELCOR-Procomm-24-225x300-2.jpg?width=225&height=300&name=23rd-Street-STELCOR-Procomm-24-225x300-2.jpg)![23rd Street STELCOR Procomm (7)](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/23rd-Street-STELCOR-Procomm-7-225x300-2.jpg?width=225&height=300&name=23rd-Street-STELCOR-Procomm-7-225x300-2.jpg)

**GENERAL CONTRACTOR:**  
GKC Industries  
Port Washington, NY

**INSTALLER:**  
Rich Anastasio/Procomm Systems  
Phillipsburg, NJ

**STRUCTURAL ENGINEER:**  
Wexler Associates  
New York, NY

**ARCHITECT:**  
PM Architecture  
New York, NY

**LOADS:**  
100 kips

**SPECIFICATIONS:**  
STELCOR 1200  
14” tip or drive plate  
12” corrugated grout column  
9” solid grout column  
8” reverse auger  
5.5” steel core  
.361 wall thickness 80 ksi

**SOILS + EMBEDMENT DEPTH:**  
25’

**TIME FRAME:**  
6 days

 Topics:

[ Case Study ](https://www.idealfoundationsystems.com/blog/topic/case-study)

[ Drilled-In Displacement Piles (DDM) ](https://www.idealfoundationsystems.com/blog/topic/drilled-in-displacement-piles-ddm)

[ STELCOR ](https://www.idealfoundationsystems.com/blog/topic/stelcor)

 Don't forget to share this post:

<https://www.facebook.com/sharer/sharer.php?u=https://www.idealfoundationsystems.com/blog/nyc-60-stelcor-micropiles-for-5-story-housing-units-in-astoria> <https://www.linkedin.com/shareArticle?url=https://www.idealfoundationsystems.com/blog/nyc-60-stelcor-micropiles-for-5-story-housing-units-in-astoria&title=60+STELCOR%C2%AE+DDM+Used+For+5-Story+Housing+Units+In+Astoria&summary=60+Stelcor+micropiles+are+now+implemented+to+support+a+5-story+housing+unit+here+in+New+York+City.+Check+out+our+installation%21> <https://twitter.com/intent/tweet?text=60+STELCOR%C2%AE+DDM+Used+For+5-Story+Housing+Units+In+Astoria&url=https://www.idealfoundationsystems.com/blog/nyc-60-stelcor-micropiles-for-5-story-housing-units-in-astoria> <https://pinterest.com/pin/create/button/?url=https://www.idealfoundationsystems.com/blog/nyc-60-stelcor-micropiles-for-5-story-housing-units-in-astoria&media=https://47216011.fs1.hubspotusercontent-na1.net/hubfs/47216011/Imported_Blog_Media/cropped-23rd-Street-STELCOR-Procomm-26.jpg&description=60+Stelcor+micropiles+are+now+implemented+to+support+a+5-story+housing+unit+here+in+New+York+City.+Check+out+our+installation%21>

## Related Articles

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Baltic%20St_.png?width=713&height=401&name=Baltic%20St_.png)

### STELCOR Supports a Complex Development Site in Brooklyn’s Gowanus Neighborhood

 May 18th, 2026|1 min read 

](https://www.idealfoundationsystems.com/blog/stelcor-supports-a-complex-development-site-in-brooklyns-gowanus-neighborhood)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/16-777x246.jpg?width=777&height=246&name=16-777x246.jpg)

### STELCOR Piles Installed Adjacent to Elevated MTA for Lorimer House Project

 May 18th, 2026|1 min read 

](https://www.idealfoundationsystems.com/blog/stelcor-piles-installed-adjacent-to-elevated-mta-for-lorimer-house-project)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/image-webp.webp?width=1350&height=900&name=image-webp.webp)

### NYC - 272 STELCOR Piles Installed for a 14-Story Development in Gowanus

 August 1st, 2025|1 min read 

](https://www.idealfoundationsystems.com/blog/nyc-272-stelcor-piles-installed-for-a-14-story-development-in-gowanus)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/86%20DELANCEY%20web(16)--jpg.jpeg?width=720&height=471&name=86%20DELANCEY%20web(16)--jpg.jpeg)

### NYC - 112 STELCOR® Piles to 30' for a 12-Story Mixed-Use Rental Building

 June 23rd, 2025|1 min read 

](https://www.idealfoundationsystems.com/blog/nyc-112-stelcor-piles-to-30-for-a-12-story-mixed-use-rental-building)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/INSTALL-SNIP-2-WEB.jpg?width=720&height=404&name=INSTALL-SNIP-2-WEB.jpg)

### 5.5″ HELICAL PILES FOR A HOSPITAL PARKING GARAGE RETROFIT

 December 28th, 2022|1 min read 

](https://www.idealfoundationsystems.com/blog/5-5-helical-piles-for-a-parking-garage-retrofit)

[![STELCOR® DDMS TOUCHING DOWN AT JFK AIRPORT](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/20220617_140517-WEB-scaled.jpg?width=2560&height=1920&name=20220617_140517-WEB-scaled.jpg)

### STELCOR® DDMS TOUCHING DOWN AT JFK AIRPORT

 October 31st, 2022|1 min read 

](https://www.idealfoundationsystems.com/blog/stelcor-at-jfk)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/install-gap-2.jpg?width=2400&height=1354&name=install-gap-2.jpg)

### 42 STELCOR® DDMS FOR WIND TURBINES IN CALIFORNIA

 July 25th, 2022|1 min read 

](https://www.idealfoundationsystems.com/blog/42-stelcor-ddms-for-wind-turbines-in-california)

[![FLYING EXCAVATORS AND STELCOR DDM’S AT A PAPER MILL IN DULUTH, MN](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/duluth-3-web-1.jpg?width=900&height=505&name=duluth-3-web-1.jpg)

### FLYING EXCAVATORS AND STELCOR DDM’S AT A PAPER MILL IN DULUTH, MN

 June 29th, 2022|1 min read 

](https://www.idealfoundationsystems.com/blog/flying-excavators-and-stelcor-ddms-at-a-paper-mill-in-duluth-mn)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/20210611_100954-WEB.jpg?width=2048&height=1536&name=20210611_100954-WEB.jpg)

### 93 STELCOR DDM’S INSTALLED FOR A 7-STORY HOSPITAL ADDITION

 March 3rd, 2022|1 min read 

](https://www.idealfoundationsystems.com/blog/93-stelcor-ddms-installed-for-a-7-story-hospital-addition)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/DSC00162-1.jpg?width=872&height=583&name=DSC00162-1.jpg)

### NYC – 75 STELCOR Piles for 8-Story Cantilevered Condos

 July 30th, 2021|1 min read 

](https://www.idealfoundationsystems.com/blog/nyc-75-stelcor-piles-8-story-cantilevered-condos)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/DC-SEWER-2-150x150-1-1.jpg?width=150&height=150&name=DC-SEWER-2-150x150-1-1.jpg)

### Keeping it Clean in Washington D.C. With STELCOR

 February 11th, 2021|1 min read 

](https://www.idealfoundationsystems.com/blog/keeping-clean-washington-d-c-stelcor)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/PATH-WEB-1.jpg?width=436&height=325&name=PATH-WEB-1.jpg)

### On the beaten PATH: More IDEAL Helical Piles In The NY/NJ Subway Stations

 October 8th, 2020|1 min read 

](https://www.idealfoundationsystems.com/blog/on-the-beaten-path-more-ideal-helical-piles-in-the-ny-nj-subway-stations)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/FNC-rendering-web-150x150-1.png?width=150&height=150&name=FNC-rendering-web-150x150-1.png)

### STELCOR For The First National Center

 August 10th, 2020|1 min read 

](https://www.idealfoundationsystems.com/blog/stelcor-for-the-first-national-center)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/CHSB-26.jpg?width=900&height=506&name=CHSB-26.jpg)

### Helical Pile Foundations for COVID-19 Field Hospitals in New York

 May 1st, 2020|1 min read 

](https://www.idealfoundationsystems.com/blog/helical-pile-foundations-for-covid-19-field-hospitals-in-new-york)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/302-east-2nd-street-exterior-rendering.jpg?width=736&height=401&name=302-east-2nd-street-exterior-rendering.jpg)

### NYC – East Village Homes See STELCOR Savings

 January 21st, 2020|1 min read 

](https://www.idealfoundationsystems.com/blog/east-village-homes)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/IMG_1908-resize.jpg?width=640&height=480&name=IMG_1908-resize.jpg)

### IDEAL Helical Piles at the naval academy

 September 17th, 2019|1 min read 

](https://www.idealfoundationsystems.com/blog/ideal-helical-piles-at-naval-academy)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/lincoln-terminal-helical-piles-night.jpg?width=576&height=324&name=lincoln-terminal-helical-piles-night.jpg)

### 1,321 Helical Pipe Piles for Lincoln Terminal in Natchez

 September 13th, 2019|1 min read 

](https://www.idealfoundationsystems.com/blog/1321-helical-pipe-piles-for-lincoln-terminal-in-natchez)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/NYHC-awards_DraperHall_image4-910x1024-910x1024-1.jpg?width=910&height=1024&name=NYHC-awards_DraperHall_image4-910x1024-910x1024-1.jpg)

### 295 STELCOR® DDM for the new 16-Story Gilbert in NYC

 March 9th, 2019|1 min read 

](https://www.idealfoundationsystems.com/blog/its-gonna-be-a-gilbert)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/Blackspring-Ridge-Wind-Project-Vickars-Image-7.jpg?width=640&height=360&name=Blackspring-Ridge-Wind-Project-Vickars-Image-7.jpg)

### 13.375″ Helical Pipe Piles For Western Canadas Largest Wind Project

 December 14th, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/13-375-helical-pipe-piles-300-megawatt-solar-project-alberta)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/86-DELANCEY-5.jpg?width=600&height=800&name=86-DELANCEY-5.jpg)

### A Boring Story – How to Save 6 Weeks, 50 Foot, and $500,000.00

 August 3rd, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/1972-2)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/draper2.jpg?width=640&height=480&name=draper2.jpg)

### NYC – 126 STELCOR® Piles to 75’ for a 14-Story Addition at Draper Hall

 May 1st, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/nyc-126-stelcor-micropiles-to-75-for-a-14-story-addition-at-draper-hall)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/Spiegel-Community-Center-Helical-Piles2.png?width=872&height=583&name=Spiegel-Community-Center-Helical-Piles2.png)

### 7″ Helical Pile Underpinning For A 100-Year-Old Community Center

 April 4th, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/7-helical-pile-underpinning-100-year-old-community-center)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/DSC01761-web.jpg?width=872&height=583&name=DSC01761-web.jpg)

### Cornell University – STELCOR® DDM for Increased Column Loading In The Historic Rand Hall

 March 21st, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/cornell-university-stelcor-ddm-increased-column-loading-historic-rand-hall)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/DC-SEWER-2-1024x576-2.jpg?width=1024&height=576&name=DC-SEWER-2-1024x576-2.jpg)

### Keeping it Clean in Washington D.C. With STELCOR

 February 2nd, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/keeping-it-clean-washington-d-c-stelcor)

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Bruce Stroyer",
    "url" : "https://www.idealfoundationsystems.com/blog/author/bruce-stroyer"
  },
  "dateModified" : "2025-01-20T18:49:37.228Z",
  "datePublished" : "2016-01-29T16:10:27.000Z",
  "headline" : "60 STELCOR® DDM Used For 5-Story Housing Units In Astoria",
  "image" : [ "https://www.idealfoundationsystems.com/hubfs/Imported_Blog_Media/cropped-23rd-Street-STELCOR-Procomm-26.jpg" ],
  "mainEntityOfPage" : {
    "@id" : "https://www.idealfoundationsystems.com/blog/nyc-60-stelcor-micropiles-for-5-story-housing-units-in-astoria",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://www.idealfoundationsystems.com/hubfs/ASSETS/logos/Ideal-Logo.png"
    }
  }
}
```